Compliance with the population's demands has been verified

Compliance with the population's demands has been verified

Today, the akim of the region Murat Ergeshbayev and the akim of the city Nurzhan Akhatov toured the microdistricts of Kyzylorda.
As a reminder, the head of the region had previously given specific instructions to ensure cleanliness and landscaping to create a comfortable environment for residents of the microdistricts. Residents had requested to build a children's playground in the courtyard of house No. 62 on Abay Avenue and to light the courtyard.
During today's tour, Murat Nalkhozhauly familiarized himself with the results of these instructions and noted the need to continue this work further.
The cleanliness and landscaping of the courtyards of multi-story residential buildings, streets, and pedestrian paths in the "Astana" and "Aray" microdistricts, and on the left bank were also inspected.
The issue of irrigation water was also not overlooked.
On the instructions of the regional akim, a pumping unit and pipes were launched on N. Nazarbayev Avenue, and irrigation water was supplied to the 2-kilometer-long ditch system on Bokeikhan Street from Abay Avenue to Yassaui Street. A pumping unit was installed at the intersection of Yassaui and Shukirov Streets, and water was also released into the 960-meter-long ditch on the section from Bokeikhan Street to G. Muratbayev Street.
Overall, the city has 98.6 kilometers of ditch systems on 68 streets.

Source: https://www.gov.kz/memleket/entities/kyzylorda/press/news/details/1279119?lang=en